Close Menu
    Facebook X (Twitter) Instagram
    Wednesday, July 29
    Facebook X (Twitter) Instagram YouTube
    Daily Express News UGDaily Express News UG
    • Home
    • Uganda Premier League
    • International Football
    • Local Football
    • Others
    Daily Express News UGDaily Express News UG
    Home»Express Sports»How Namboole Stadium will look after ongoing remodeling
    Express Sports

    How Namboole Stadium will look after ongoing remodeling

    June 27, 2026No Comments
    Facebook Twitter Pinterest LinkedIn Telegram Tumblr Email WhatsApp
    Share
    Facebook Twitter LinkedIn Pinterest Email WhatsApp

    [wordads]

    David GOMBE

    The State Minister of Sports Peter Ogwang has released a photo showing the artistic impression of how Mandela National Stadium will look after its ongoing remodeling.

    The image on Ogwang’s socials provides a glimpse of the stadium’s exterior design once the upgrade works are completed.

    David GOMBEThe State Minister of Sports Peter Ogwang has released a photo showing the artistic impression of how Mandela National Stadium will look after its ongoing remodeling.

    The ongoing works will cater for expanding the seating capacity to approximately 45,000 spectators, roofing the entire stadium, constructing modern VVIP lounges, upgrading the media tribune for the Stadium to meet the required CAF Standards for 2027 Africa Cup of Nations Games.

    The project is being conducted by the UPDF Engineering Brigade under the supervision of Afande Peter Kidemuka as part of Uganda’s preparations to co-host AFCON 2027.

    State Minister for Sports Peter Ogwang has confirmed that Phase Two of the remodeling of Mandela National Stadium will cost 60 million US dollars, (approximately Shs248billion), to meet the Confederation of African Football (CAF) standards.

    Uganda, Kenya and Tanzania is set to host the 2027 edition of the Africa Cup of Nation but the CAF inspection team in February stated that the three nations were not ready to host the mega showpiece at the time.

    According to the CAF report, Mandela National Stadium required major upgrading works, indicating that by then it presented major compliance gaps with CAF Category 4 requirements.

    Namboole Ongoing remodeling Stadium
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email WhatsApp

    Related Posts

    Women’s Super League: Charlton sign Leicester’s Ashleigh Neville

    July 29, 2026

    Former Vipers Midfielder joins BUL FC

    July 29, 2026

    Commonwealth Games 2026: Soppy socks & a slathering of deep heat – rain causes chaos in Glasgow

    July 29, 2026

    George Kaddu completes return to the UPL

    July 29, 2026

    Celtic make Denmark striker Kasper Hogh their record signing

    July 28, 2026

    KCB Bank Uganda Joins National Call to End Malaria at Parliamentary Malaria Walk

    July 28, 2026
    Leave A Reply Cancel Reply

    Top Posts

    Crested Cranes Forward Fauzia Najjemba Joins Boston Legacy

    January 9, 2026

    FORTEBET CELEBRATES MBARARA, KABALE, ISINGIRO PUNTERS IN STYLE

    February 11, 2026

    THE GUNNERS/UNITED EPIC CLASH, SUPER 61M WIN & FORTEBET BETTING FREEDOM

    January 25, 2026
    Don't Miss

    Women’s Super League: Charlton sign Leicester’s Ashleigh Neville

    July 29, 2026

    Charlton Athletic have signed full-back Ashleigh Neville from Leicester City on a two-year deal.The 33-year-old,…

    Former Vipers Midfielder joins BUL FC

    July 29, 2026

    Commonwealth Games 2026: Soppy socks & a slathering of deep heat – rain causes chaos in Glasgow

    July 29, 2026

    George Kaddu completes return to the UPL

    July 29, 2026
    Facebook X (Twitter) Instagram Pinterest YouTube Dribbble
    • Privacy Policy
    • Terms of Service
    © 2026 - Daily Express News UG. All rights reserved.

    Type above and press Enter to search. Press Esc to cancel.

    Ad Blocker Enabled!
    Ad Blocker Enabled!
    Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.